2022

Air liquide Hydrogen Ludwigshafen Gemany

Assembly of pipe bridge and supports. Stainless steel highpressure pipelines instalation.

2022

Isar aerospace Ottobrun Germany

Double-walled pipe system instalation.

2022

Sweden paper mills

Shutdown jobs arounf the Sweden paper mills.

2022

Bold printing Stockholm

Stainless pipe prefabrication and instalation.

2022

EcoData center Falun

Prefabrication of stainless steel pipes in the Workshop. Instalation and assembly on site.

2022

SCA Ortviken – CTMP

Assembly of steel construction and support for pipes Stainless and carbon steel pipes instalation, documentation and pressure testing included.

2022

SCA Obbola

Maintenance services in paper mill.

2022

Renewcell Sundsvall

Manufacturing and assembly support for pipes. Instalation stainless and carbon steel pipelines. Pressure testing and documentation included.

2022

Metsa Hussum

Steam pipelines prefabrication and instalation.

2022

Northvolt Ett Skelleftea

Continuing of pipelines instalation. Pressure testing and ducumentation included.

2021

Workshop pipe prefabrication

Workshop pipe prefabrication.

2021

SCA Ostrand Timra

Shutdown jobs.

2021

Iggesung Bruk

Shutdown jobs.

2021

Vallvik Bruk

Shutdown jobs.

2021

Bilerundkorsnas Gavle

Shutdown jobs.

2021

Stora Enso Skutskar

Shutdown jobs.

2021

SCA Obbola

Maintenance services in paper mill. Carbon and stainless steel pipes instalation and other various works.

2021

Northvolt ett Skelleftea

Stainless steel pipe instalation for air and cooling system. Instalation of ventilation spiral pipes and Hilti support assembly.

2020

SCA Obbola

Stainless steel pipe instalation, maintenance services.

2020

Vallvik Bruk paper mill

Shutdown jobs in paper mill.

2020

Befesa Scandust Landskrona

Replacing of rotary kiln in Befesa Scandust Landskrona.

2020

Bilerundkorsnas Gavle

Pipelines water line in paper mill prefabrication and instalation.

2020

Vattenfall Power plant

Carbonsteel pipe prefabrication and instalation incl. Support for  watterline DN600 – DN1000. Instalation of new valves DN700.

2020

Northvolt lab Vasteras

Stainless pipeline instalation for batery laboratory.

2019

Iggesung Bruk

Pipelines prefabrication and instalation for new evaporation plant.

2018

Iggesung Bruk

Assembly of new  pipe bridge for evaporation plant.

2018

SCA Ostrand Timra

Project Helios – prefabrication and instalation pipelines fromstainless and carbon steel for Fiber line.

2017

Bilerundkorsnas Gavle

Pipelines prefabrication and instalation. Shutdown works.

2017

Iggesund Bruk

Pipelines instalation.

We will prepare a quotation for you

Do you want to know more? Do you need solutions or services tailored to your business? Do not hesitate to contact us!

© 2024 All rights reserved for E.W.S., s. r. o.
Select your privacy settings to continue. Please read our privacy policy and cookie policy for more information.